Minimum Number of Helpers is More Profitable

A Sewing Line with Minimum Number of Helpers is More Profitable - How would You Prove This?


Question


I have started my career as an Industrial Engineer in a Jeans manufacturing company. In past few weeks I had gone through nearly all of your articles on IE on your blog and it has been a great help for me. But, I need some additional advises and I thought your help would be best for me.

I have been given an assignment to reduce helpers in the sewing department. Managers have observed that in many operations together with a machinist, a helper is also provided. Thus, this increase cost and consume time as the helper could have been placed to work as a machinist. Therefore, I want to know what method to use to show the line managers that it would be more profitable to reduce helpers from the floor. ... asked by Tashreen from Mauritius.


Image source: traffickalerts.wordpress.com

Answer



Tashreen I appreciate your bold step that you have taken to show line managers that by reducing unnecessary helpers from the line, you are actually improving the performance of the factory. Read my answer to find a way.

Rakuten LinkShare Welcome Program First thing first, look into some theories.

You can analyse profitability of a line by using two measures - Labor Productivity and Line Efficiency.

Reason#1: Higher the productivity lower is labor cost per garment
Reason#2: Higher the line efficiency lower is labor cost per garment
And a reduced cost brings a higher profit

Additionally you can measure labor cost per garment. From the labor cost figure you can directly show the benefits of reduction in helpers from the sewing floor.

Next, you have to record few things to calculate above measures. Instead of two measures you can work on one measure only. Collect following information for a sewing line

  1. Number of helpers allocated
  2. Number of operators
  3. Daily production
  4. Working hours
  5. Garment SAM
  6. Helpers salary/day, OT payment, other Bonus if applicable

Prepare for a demonstration: You can show good figures to your manager by changing numbers here and there. But that would not work without practical demonstration. I would suggest you to pick one line for experiment (Pilot Line). Focus on that line only. Followings are the process to demonstrate it.

Rakuten LinkShare Welcome Program Step#1: Collect data for the above parameters.
For example, suppose number of helpers 15, number of operators 25, daily production 400 pieces, working hours 8 hourly daily.

Step#2: Calculate labor productivity with the existing manpower (operators + helpers). In the example total number of labors is 40 (25+15).

Labor productivity = Production per day / Total manpower input

Existing labor productivity = 400/40 = 10 pieces per labor

Step#3: Calculate labor cost per garment produced = (Total salary paid for the day / Total garment produced)
Calculate labor cost using actual figures from your factory.

Step#4: Action plan
Find what kind of jobs operators are actually doing in the line? Are they just assisting sewing operators by trimming chain of threads, aligning garment components after stitching or doing manual operations? In case operators can do his/her operations by their own, remove helpers from those workstations. Instead of removing all helpers on the same day, you can go step by step. It doesn't mean that you need to fire your helpers from the factory. As you said you can train them and employ them as operator.

Suppose you have reduced 5 helpers from the line. Now only 10 helpers are working in the pilot line.

Give operator time to practice working without helpers. Once they are habituated working without helpers capture production data. After reduction of the helpers you may or may not find slight reduction in production. Assume that you get same production as before i.e. 400 pieces.

Rakuten LinkShare Welcome Program Step#5: Calculate Labor productivity of the pilot line after helper reduction. Calculate labor cost per garment also.
From the above example, Current Labor Productivity = 400/35 = 11.42 pieces per labor.

Step#6: Now compare the labor productivity and labor cost per garment. Possibly, you will find that current labor productivity is higher than existing labor productivity. You can expect in reduction of labor cost when labor productivity goes up. This way you can show your managers, that reducing helpers is beneficial for the line. It reduces labor cost per garment and factory will earn more profit.

Improvement in Labor productivity = (11.42 -10)*100/10 = 14.2%
From this much improvement of productivity you will get minimum 14.2% reduction in labor cost.

Note: When you are removing helpers, you might need to train operators and change their habit. You might need to push them to keep production as per target.

All the best.
Rakuten LinkShare Welcome Program

Saturday, August 30, 2014

IE Guide to Job Interview Preparation

Table of Contents of the Book (IE Guide to Job Interview Preparation)



LinkShare_468x60v2

Inside the book you will get answers of the following 50 Frequently Asked Questions.

 

Table of Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
What is Industrial Engineering?
 What is the basic Functions of Industrial Engineering department in the garment industry?   
What is work measurement? What techniques are used for work measurement?    
What is Pitch time?
What is Needle Time? What is the percentage of needle time of total working during a day?
Define Standard Time (SMV and SAM)?
How to calculate Standard Time (SAM) of an operation using Time Study method?
What is rating (performance rating)?
What is line efficiency? What is the formula for calculating Line efficiency? How to measure factory efficiency?
How to calculate (production) target for a sewing line?
How to set hourly target for an operation?
Garment operation breakdown (approximate SAM, Machine, Target)
 What is productivity?
How to calculate labor productivity and machine productivity?
How will you improve productivity of a line?
How do you improve efficiency of a line?
What is the difference between production and Productivity?
What is TMU in motion analysis? How many TMU is equal to one seconds and one minute?
 What do you mean by bottleneck operation? How do you find bottleneck operations in a line?
What is Line balancing? How do you balance a line?
Why it is important to balance a line? Did you work on balancing a line?
Why work aids are used in sewing? Name few basic attachments and guides used in a sewing operations.
What is learning curve? What is the application of the learning curve in garment production?
What is off-standard time? How you would track off-standard time (Non-Productive time)?
Thread consumption ratio/factor for different machines? Calculate Thread requirement for this (provide you a garment) sample.
How to calculate Labor Cost in production?
How to calculate manpower requirement for production?
What is Line Setup time and Operation Cycle Time?
What do you mean by improving?
What is Time Study? Why do you do Time study?
What is Method Study? Why Method study is important? Or what are the objectives of method study? What are the steps of method study?
Name some special sewing machines.
What improvements would you suggest for a sewing floor?
What are the Key Performance Indicators (KPIs) of a factory?
What is the difference between an Industrial Engineer and a Production Person?
Which one is better method to know factory performance, Productivity or Cost per standard minute (SAM)?
 Give me some examples of improvement work you have done in the previous companies (Creative Work).
What is Sewing Operator Skill Matrix?
What are the benefits of skill matrix in Production?
What is throughput time? What should be the throughput time of an average style?
How would you find throughput time of a style?
What is lead time, order changeover time and idle time?
How do you hire sewing operators?
Explain Basic Concept of Lean Manufacturing? Name few common lean tools that are used in apparel manufacturing?
How many machines are you handling in the current company?
Can you work on excel sheet (MS Office Spreadsheet)? How much computer skill do you have?
 What all reports do you make in the company where you are currently working?
Are you a trained IE or GSD practitioner? What you know about GSD?
Can you run sewing machine?   
How to measure factory performance? How to measure individual operator performance?           
Annexure: Interview Question sets
Personal Interview (PI) Preparation